Building consists of a two-story office structure attached to an industrial shop in Fort Saint John. The second floor of the office structure was supplied as an Ecospan project converted from a Hambro system & erected by the general contractor.
Project Completed: 2015
Steel Fabricator: M3 Steel
Architect/Designer: Kumlin Sullivan Architecture Studio Ltd. / Force Engineering Group Inc.
General Contractor: W.L. Construction Ltd.